Search
Now showing items 1-2 of 2
Evaluating factors causing time and cost overruns in road projects in Roads department, Botswana
(University of Botswana, www.ub.bw, 2016)
Successful performance in a construction projects help to deliver a good product to the client. Poor time and cost performance on projects has become the key concern in Roads Department, Botswana. This is evidenced by ...
A comparison of use of L- moment and LH- moment methods of parameter estimation for the regional flood frequency analysis in semi-arid areas: the case of Limpopo catchment, Botswana
(University of Botswana, www.ub.bw, 2016)
Design flood estimation is an important task that is required in the planning and design of many hydraulic structures. This study was therefore aimed at developing the regional growth curves for estimation of floods of ...