Search
Now showing items 1-2 of 2
Evaluating factors causing time and cost overruns in road projects in Roads department, Botswana
(University of Botswana, www.ub.bw, 2016)
Successful performance in a construction projects help to deliver a good product to the client. Poor time and cost performance on projects has become the key concern in Roads Department, Botswana. This is evidenced by ...
Experimental and numerical evaluation of a solar dryer for drying banana (Musa spp)
(University of Botswana, www.ub.bw, 2019-10)
A forced convection indirect type solar dryer having a double pass flat collector that can be used for drying bananas was designed, constructed and tested experimentally and numerically evaluated. The study mainly tried ...