UBRISA

View Item 
  •   Ubrisa Home
  • Faculty of Science
  • Environmental Science
  • Research articles (Dept of Environmental Science)
  • View Item
  •   Ubrisa Home
  • Faculty of Science
  • Environmental Science
  • Research articles (Dept of Environmental Science)
  • View Item
    • Login
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The new role of the construction manager/client engineer/quantity surveyor

    Thumbnail
    View/Open
    Main article (1.281Mb)
    Date
    2009
    Author
    Ntshwene, K.
    Kashiwagi, J.
    Kashiwagi, D.
    Publisher
    Royal Institute of Chartered Surveyors http://www.rics.org/site/download_feed.aspx?fileID=5042&fileExtension=PDF
    Type
    Published Article
    Metadata
    Show full item record
    Abstract
    The traditional contracting/delivery system in Botswana, introduced by the US, UK, and European educators, consultants, and practitioners, has not been working well in Botswana. The poor project delivery system results have forced the organization of a new group, the Government Implementation Coordination Group (GICO) to attempt to solve the problems. In the fall of 2008, the University of Botswana (UB), through the US State Department sponsored Fulbright program, brought professor Kashiwagi, and the best value Performance Information Procurement System (PIPS) technology, the Information Measurement Theory (IMT), and the Industry Structure Analysis to the UB project management section. This paper proposes that the client’s professional representative requires a new, more effective role. The role includes using performance information, transforming the client’s expectations into a design/construction intent by using expert vendors, ensuring the vendors manage and minimize the risk that they do not control, outsourcing the technical responsibilities, and doing quality assurance instead of quality control. This paradigm will minimize project risk, maximize project value, and increase the professionalism of project management, construction management, and quantity surveyors. These concepts will be tested on three test projects in Botswana.
    URI
    http://hdl.handle.net/10311/473
    Collections
    • Research articles (Dept of Environmental Science) [65]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of UBRISA > Communities & Collections > By Issue Date > Authors > Titles > SubjectsThis Collection > By Issue Date > Authors > Titles > Subjects

    My Account

    > Login > Register

    Statistics

    > Most Popular Items > Statistics by Country > Most Popular Authors